Proven IBS can be
explained using “BCF” for BETTER, COMPETITIVE, FASTER. We are proud that
our IBS components, namely the Pre-Stressed Half Slabs, Interlocking
Engineering Blocks and Bricks are better in terms of quality, using only the
highest quality ingredients such as concrete. We are competitive in terms of
pricing and we can match the conventional method of construction price easily.
We are also proven to be 30% to 50% faster thus reducing your project time
significantly.
The term IBS is defined
as INNOVATIVE PROCESS of building
construction using the concept of MASS - PRODUCTION of industrialized systems,
produced at the factory or onsite within controlled environment, it includes
the LOGISTIC and INSTALLATION aspect of it, done in proper coordination with
SYSTEMATIC PLANNING and INTEGRATION.
Constructability
is generally reducing the problems of construction by incorporating the
construction knowledge into the design of a construction project. The Malaysian
construction industry is attempting to promote and use Industrialized Building
systems (IBS) for better construction practice with more effectiveness and
efficiency, but in terms of constructability and research into the application
of constructability concepts for IBS little work has been done. In fact the
Malaysian construction industry is still not applying the concepts of
constructability in totality and there is lack of constructability research in
Malaysia. In this research the application status of constructability concepts
which have been previously defined for Malaysia are examined and assessed
within the Malaysian IBS industry.